The challenge
The project required a maintainable shared home for compute, power, perimeter security and network distribution equipment.
Technical considerations
The layout had to accommodate two servers, a UPS, firewall, 10 Gb/s core switch, 1 Gb/s access switch and copper termination on two 24-port patch panels.
What N+3 delivered
N+3 installed the rack and mounted the servers, UPS, firewall and both switches, organizing network cabling through two 24-port patch panels.
The outcome
Compute, power and network equipment were centralized in a logical rack layout that simplifies access, maintenance and later changes.